Lifesaving blood plasma products are not something you would normally associate with ASKIN Performance Panels, but when CSL Behring gave the green light to construct a $64million facility in Broadmeadows, ASKIN Performance Panels were honoured to be involved.
The CSL Behring manufacturing site required an expansion to its existing premises to help meet growing demand for its global critical care therapy.
A5 Architects were the architect of choice, and the building contract awarded to Cockram Construction Pty Ltd, who engaged ASKIN for the installation. A5 Architects specified ASKIN’s XFLAM fire performance panel to be used for external facades, internal walls, ceilings and pharmaceutical clean rooms. ASKIN worked closely with Cockram Construction to install 23,900m2 of XFLAM insulated panel.
The Challenge
The size and detail of this project resulted in many challenges. Continuous design changes meant responsive drafting, product manufacturing and flexibility of site resources was the key to success.
With more than 150 various tradespeople on site at any one time, all with their own milestones and objectives made communication imperative regarding on-site access and product movement.
Furthermore, the design itself was complicated due to the heavily detailed brief. To ensure the structural integrity of connections, ASKIN’s engineering resource was used throughout the build.
The Solutions
ASKIN provided a combination of complex airtight clean rooms, with high-performance joints and connections to ensure a complete clean facility.
All lighting and mechanical services were concealed, recessed and sealed off to meet client specifications of no visible mechanical fixings.
In addition to this, custom-made door frames, stainless steel framed rapid clean doors, sliding doors, and ultra clean single and double-glazed windows were specifically manufactured to suit the pharmaceutical environment.
All ASKIN door and window products featured concealed fixing and flush finishes for ease of cleaning and sanitization in a highly sensitive clean room space.
The external cladding was a blend of XFLAM exteriors in both vertical and horizontal applications. The design created depth and shadow throughout the elevations while complimenting the CSL brand.
The Results
The newly completed expansion of CSL Behring world-class manufacturing facility allows them to double the output of an in-demand blood plasma product for patients facing major surgery, trauma or serious infections and burns. It’s been an excellent outcome for all.